Abstract

Background. In preemptive job scheduling, total weighted tardiness minimization is commonly reduced to solving a combinatorial problem, which becomes practically intractable as the number of jobs and the numbers of their processing periods increase. To cope with this challenge, heuristics are used. A heuristic, in which the decisive ratio is the weighted reciprocal of the maximum of a pair of the remaining processing period and remaining available period, is closely the best one. However, the heuristic may produce schedules of a few jobs whose total weighted tardiness is enormously huge compared to the real minimum. Therefore, this heuristic needs further improvements, one of which already exists for jobs without priority weights with a sorting approach where remaining processing periods are minimized. Three other sorting approaches still can outperform it, but such exceptions are quite rare. Objective. The goal is to determine the influence of the four sorting approaches and try to select the best one in the case where jobs have their priority weights. The heuristic will be applied to tight-tardy progressive idling-free 1-machine preemptive scheduling, where the release dates are given in ascending order starting from 1 to the number of jobs, and the due dates are tightly set after the release dates. Methods. To achieve the said goal, a computational study is carried out with applying each of the four heuristic approaches to minimize total weighted tardiness. For this, two series of 4151500 scheduling problems are generated. In the solution of a scheduling problem, a sorting approach can “win” solely or “win” in a group of approaches, producing the heuristically minimal total weighted tardiness. In each series, the distributions of sole-and-group “wins” are ascertained. Results. The sole “wins” and non-whole-group “wins” are rare: the four sorting approaches produce schedules with the same total weighted tardiness in over 98.39 % of scheduling problems. Although the influence of these approaches is different, it is therefore not really significant. Each of the sorting approaches has heavy disadvantages leading sometimes to gigantic inaccuracies, although they occur rarely. When the inaccuracy occurs to be more than 30 %, this implies that 3 to 9 jobs are scheduled. Conclusions. Unlike the case when jobs do not have their priority weights, it is impossible to select the best sorting approach for the case with job priority weights. Instead, a hyper-heuristic comprising the sorting approaches (i. e., the whole group, where each sorting is applied) may be constructed. If a parallelization can be used to process two or even four sorting routines simultaneously, the computation time will not be significantly affected.

Keywords

References

  1. M.L. Pinedo, Planning and Scheduling in Manufacturing and Services. New York: Springer-Verlag, 2009, 536 p. doi: 10.1007/978-1-4419-0910-7
  2. V.V. Romanuke, “Accuracy of a heuristic for total weighted completion time minimization in preemptive single machine scheduling problem by no idle time intervals,” KPI Sci. News, no. 3, pp. 52–62, 2019. doi: 10.20535/kpi-sn.2019.3.164804
  3. V.V. Romanuke, “Minimal total weighted tardiness in tight-tardy single machine preemptive idling-free scheduling,” Appl. Comput. Syst., vol. 24, no. 2, pp. 150–160, 2019. doi: 10.2478/acss-2019-0019
  4. M. Batsyn et al., “Online heuristic for the preemptive single machine scheduling problem of minimizing the total weighted completion time,” Optimiz. Method. Softw., vol. 29, no. 5, pp. 955–963, 2014. doi: 10.1080/10556788.2013.854360
  5. V.V. Romanuke, “Infinity substitute in exactly minimizing total tardiness in tight-tardy progressive 1-machine scheduling by idling-free preemptions of equal-length jobs,” Bulletin of V. Karazin Kharkiv National Univ. Math. Modell. Inf. Technol. Autom. Control Syst., no. 44, pp. 94–101, 2019. doi: 10.26565/2304-6201-2019-44-10
  6. V.V. Romanuke, “Efficient exact minimization of total tardiness in tight-tardy progressive single machine scheduling with idling-free preemptions of equal-length jobs,” KPI Sci. News, no. 1, pp. 27–39, 2020. doi: 10.20535/kpi-sn.2020.1.180877
  7. V.V. Romanuke, “Job order input for efficient exact minimization of total tardiness in tight-tardy progressive single machine scheduling with idling-free preemptions,” Proc. O.S. Popov ОNAT, vol. 1, no. 1, pp. 19–36, 2020. doi: 10.33243/2518-7139-2020-1-1-19-36
  8. V.V. Romanuke, “Tight-tardy progressive idling-free 1-machine preemptive scheduling by heuristic’s efficient job order input,” KPI Sci. News, no. 3, pp. 32–42, 2020. doi: 10.20535/kpi-sn.2020.3.199850
  9. K.-C. Ying et al., “Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic,” Exp. Syst. Applicat., vol. 36, no. 3, pp. 7087–7092, 2009. doi: 10.1016/j.eswa.2008.08.033
  10. Y.H. Lee et al., “A heuristic to minimize the total weighted tardiness with sequence-dependent setups”, IIE Trans., vol. 29, no. 1, pp. 45–52, 1997. doi: 10.1080/07408179708966311
  11. F. Jaramillo and M. Erkoc, “Minimizing total weighted tardiness and overtime costs for single machine preemptive scheduling,” Comput. & Ind. Eng., vol. 107, pp. 109–119, 2017. doi: 10.1016/j.cie.2017.03.012
  12. M. Tamannaei and M. Rasti-Barzoki, “Mathematical programming and solution approaches for minimizing tardiness and transportation costs in the supply chain scheduling problem,” Comput. & Ind. Eng., vol. 127, pp. 643–656, 2019. doi: 10.1016/j.cie.2018.11.003
  13. V.V. Romanuke, “A sorting improvement in the heuristic based on remaining available and processing periods to minimize total tardiness in progressive idling-free 1-machine preemptive scheduling,” KPI Sci. News, no. 1, pp. 7–16, 2021.
  14. M.L. Pinedo, Scheduling: Theory, Algorithms, and Systems, Springer International Publishing, 2016, 670 p. doi: 10.1007/978-3-319-26580-3
  15. R.L. Graham et al., “Optimization and approximation in deterministic sequencing and scheduling: A survey,” in Annals of Discrete Mathematics, vol. 5, 1979, pp. 287–326. doi: 10.1016/S0167-5060(08)70356-X
  16. R. Panneerselvam, “Simple heuristic to minimize total tardiness in a single machine scheduling problem,” Int. J. Advanc. Manuf. Technol., vol. 30, no. 7-8, pp. 722–726, 2006. doi: 10.1007/s00170-005-0102-1
  17. Z. Tian et al., “An algorithm for scheduling equal-length preemptive jobs on a single machine to minimize total tardiness,” J. Schedul., vol. 9, no. 4, pp. 343–364, 2006. doi: 10.1007/s10951-006-7039-6
  18. V.V. Romanuke, “Heuristic’s job order efficiency in tight-tardy progressive idling-free 1-machine preemptive scheduling of equal-length jobs,” KPI Sci. News, no. 2, pp. 64–73, 2020. doi: 10.20535/kpi-sn.2020.2.181869
  19. R.T. Kneusel, Random Numbers and Computers, Springer International Publishing, 2018, 260 p. doi: 10.1007/978-3-319-77697-2
  20. J.M.A. Trejo and C.S. Calude, “A new quantum random number generator certified by value indefiniteness,” Theoretical Comput. Sci., vol. 862, pp. 3–13, 2021. doi: 10.1016/j.tcs.2020.08.014
  21. W.-Y. Ku and J.C. Beck, “Mixed integer programming models for job shop scheduling: A computational analysis,” Comput. & Operations Res., vol. 73, pp. 165–173, 2016. doi: 10.1016/j.cor.2016.04.006
  22. D. Kress et al., “An exact solution approach for scheduling cooperative gantry cranes,” European J. Operational Res., vol. 273, no. 1, pp. 82–101, 2019. doi: 10.1016/j.ejor.2018.07.043
  23. H. Chen et al., “A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem,” Exp. Syst. Applicat., vol. 167, p. 114174, 2021. doi: 10.1016/j.eswa.2020.114174
  24. H.-B. Song and J. Lin, “A genetic programming hyper-heuristic for the distributed assembly permutation flow-shop scheduling problem with sequence dependent setup times,” Swarm Evol. Comput., vol. 60, p. 100807, 2021. doi: 10.1016/j.swevo.2020.100807
§ 06 — Related

Similar articles in this journal

Related peer-reviewed studies published in this journal.
View all issues

MODIFICATION OF THE SEPARABLE PHYSICS-INFORMED NEURAL NETWORK METHOD FOR THE APPROXIMATE SOLUTION OF A MIXED PROBLEM FOR THE HEAT CONDUCTION EQUATION IN AN ELLIPTICAL DOMAIN

Valerii Los, Oleksandr Riakhin

Background. Parabolic differential equations are mathematical models in engineering designed to study wide range of applied models. This necessitates the development of…

#heat conduction equation #mixed parabolic problem #elliptical domain #physics-informed neural network
10.20535/kpisn.2026.3.367316

Similar Articles

1-10 of 199

You may also start an advanced similarity search for this article.